Vulcan-hart ML-103837 Manuel d'utilisateur Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
– 5 –
INSTALLATION
UNPACKING
This cheesemelter was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the cheesemelter is found to be damaged, save the packaging
material and contact the carrier within 7 days of delivery.
1. Unpack cheesemelter and remove all packaging materials.
Heater and legs on countertop and pass through models, and heaters on wall mounted
models, will be found wrapped and fastened to the floor inside the cheesemelter.
2. Screw in the four legs provided.
3. Place cheesemelter on a flat horizontal surface at the desired location.
4. Level the cheesemelter (if needed) by turning the adjustable bottom part of the legs. See sketch
below.
LOCATION
Do not install pass through cheesemelters on a wall. Pass through cheesemelters must be installed
with adequate clearances for servicing and proper operation.
Do not operate countertop and pass through cheesemelters without the legs in place. Damage to the
countertop may result.
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 23 24

Commentaires sur ces manuels

Pas de commentaire